Plant-42 / Contract Manufacturing
Transportation & Aviation
From aircraft cabins to ground fleets and medevac vehicles, Plant-42 manufactures and packages surface care products around the way crews clean between runs. Bring your formula, equipment and supply needs.
Transportation & Aviation
Build around the turnaround.
Aircraft interiors
Plan packaging and supply around the specific aircraft interior application and its review requirements.
Plan aircraft-interior supplyGround fleets
Match production and pack sizes to the equipment, service locations and pace of fleet operations.
Plan a fleet programMedevac and ground support
Build the supply plan around ground equipment, staging and frequent turnarounds.
Plan support-equipment supplyWhat to review Set the turnaround and duration criteria first. Confirm material compatibility and include a gamma irradiation review if it is part of your workflow.
Your brand, our manufacturing
White-label product catalog
Build your branded product line from established Plant-42 formulas. Review the product fit, packaging and demand forecast with our manufacturing team. Open a product for details; use arrows or swipe to view sizes.
Rinse-Free Skin Cleanser
Build an airline hygiene line around a rinse-free cleanser that cleans, absorbs into skin and moisturizes without towel wiping.
- Cleans, absorbs into skin and moisturizes
- No towel wiping for commercial airline use
- 1 Gallon supply for your branded airline program
Biocompatible Cleaner
Build one branded cleaning line across three sectors with a USP-grade-water formula, fragrance options and formats from pocket to bulk.
- Water-based; formulated without alcohol or bleach
- Fragrance choices for a differentiated branded line
- 18 mL to 265 Gallon liquid formats
EPA-Registered Hospital Disinfectant
Add an EPA-registered hospital disinfectant to your portfolio through supplemental distribution under your brand.
- EPA Reg. No. 100629-3; ready to use
- Your brand through EPA supplemental distribution
- 18 mL, 32 oz and 1 Gallon formats
Aviation compatibility
EPA-Registered Hospital Disinfectant. Boeing BSS 7434 materials-compatibility approval was reported for the original formula. Review the test documentation for the exact formula with your operator before any aircraft use and follow the current EPA label.
Explore the transportation applicationWorking dogs
Explore grooming and routine care products for working dogs in this industry, with options for your brand.
Catalog and custom packaging
Catalog formats shown are documented for at least one program on this page. Confirm the current pack, closure and availability for your formula. Other formats can be reviewed as custom requests. Images are illustrative.
Custom requests
- Alternate sizes
- Alternate closures and dispensers
- Label and carton configuration
- Bulk delivery configuration
EPA-registered product programs
Eligible hospital disinfectant programs can be sold under your brand through EPA supplemental distribution (sub-registration), subject to the registrant’s agreement, the applicable filing and approved labeling.
Plant-42 operates an EPA-registered pesticide-producing establishment. We can manufacture and package customers’ EPA-registered products at that establishment, subject to product, label and production review.
Application navigator
Start with what crews clean between runs.
A cabin interior, a medevac stretcher and ground-support equipment each have their own material and review requirements. Choose the workflow that matches your customer’s job. Include how crews apply the product, what water they need if they mix it on site, and how they restock.
Four starting points. Different requirements.
Your selection only changes this page and the links you choose to follow.
01 / FLEET
Start with the vehicle and its working day.
Start with the surfaces and equipment in a ground fleet or medevac workflow. Describe how crews prepare and apply the product between runs, then use that routine to define the product, package and replenishment plan.
- 01Use location
- 02Product brief
- 03Buyer review
- 04Supply plan
Planning framework / review steps are defined for the actual program.
- Application boundaryName the vehicle area, substrate and task. Distinguish exterior, interior and workshop uses.
- Operating methodDescribe dilution or preparation, equipment, contact conditions and the existing procedure.
- Acceptance routeIdentify the maintenance lead, technical reviewer and purchaser who need to evaluate the proposal.
- Commercial handoffDefine package preferences, demand estimates and receiving requirements for discussion.
Suitability belongs to the actual product, surface and procedure. A fleet use does not establish aircraft suitability.
02 / GROUND
Define the equipment around the operation.
Build the product conversation around the ground equipment or support workflow your customers use. Keep the equipment, maintenance task and operating location explicit so the technical and commercial review addresses the right job.
- 01Equipment
- 02Use method
- 03Review owner
- 04Program scope
Planning framework / review steps are defined for the actual program.
- Equipment and materialsIdentify the equipment category, surfaces, seals or other materials relevant to the task.
- Procedure and handlingShare preparation steps, application equipment and any instructions that constrain the proposed use.
- Review responsibilityClarify who owns equipment care and which customer or manufacturer documents need to be considered.
- Supply requirementsDiscuss package format, handling needs, estimated demand and destination.
A ground-support application is its own scope. It does not establish suitability for aircraft structures or systems.
03 / FACILITY
Separate the facility from the vehicle.
Airport, public transit, depot and hangar cleaning programs have their own requirements. Describe the facility surface, soil and maintenance task, then identify the product role and who approves its use.
- 01Site area
- 02Surface & task
- 03Use review
- 04Replenishment
Planning framework / review steps are defined for the actual program.
- Use locationName the facility area and surfaces. State whether the task involves floors, work areas or equipment.
- Product roleDescribe the intended cleaning or maintenance job and the procedure it would enter.
- Site acceptanceIdentify the facilities, operations or purchasing reviewer and the documentation needed for evaluation.
- Ongoing supplyBring package, storage, receiving and replenishment requirements into the brief.
Facility care is distinct from aircraft use. No antimicrobial, safety or environmental outcome is implied by this planning route.
04 / REVIEW
Put the intended use and acceptance gate first.
For an aviation distributor, supplier or aircraft cleaning partner, start with the exact use and the customer’s acceptance process. Establish the component or surface, applicable instructions and required review before treating a proposed product as a candidate.
- 01Exact use
- 02Requirements
- 03Technical gate
- 04Next decision
Planning framework / review steps are defined for the actual program.
- Define the boundaryIdentify the component, surface or procedure and distinguish direct aircraft use from adjacent facility or ground work.
- Bring the requirementsShare the relevant material information, customer specifications and manufacturer instructions.
- Name the authorityIdentify who decides whether a product can be considered and which evidence or evaluation they require.
- Agree the next decisionDefine the review scope before discussing development, production or supply commitments.
This is an application-review route, not a statement of aviation approval, OEM acceptance or aircraft compatibility. Those requirements must be established for the actual product and use.
Review gates
A clear route through the decisions.
Technical evaluation and purchasing are different decisions. Use these gates to identify the information and people needed for the next step.
01 / USEEstablish the application boundary.
Make the use location a shared reference before selecting a development or manufacturing route.
- Product task and intended user
- Substrates, components and known material restrictions
- Preparation, handling and application method
02 / REVIEWDefine what acceptance requires.
A product brief should identify the customer’s decision process, rather than assume that suitability in one setting transfers to another.
- Customer specifications and relevant equipment instructions
- Evidence or evaluation the reviewer expects
- Named technical reviewer and decision authority
03 / PROGRAMConnect the product to the purchase.
Bring the commercial buyer and service workflow into the same conversation as the technical requirements.
- Supplier, distributor, service-provider or brand role
- Package, forecast, receiving and replenishment needs
- Scope, responsibilities and approvals to be agreed
Define the manufacturing program.
Bring the formula, cleaning equipment, turnaround requirements and demand estimate. Plant-42 reviews production, packaging and replenishment for the defined use.
Plan your transportation product ↗Florida Biotech / Contract EngineeringNeed engineering before production?
Continue to Florida Biotech for contract engineering, new-product development or formulation-enhancement discussions. Keep the same transportation application in view.
Continue to Florida Biotech ↗Each company’s scope, responsibilities and commercial arrangements are agreed for the project. Moving between these paths does not establish product approval, automatic acceptance or a production commitment.
Keep exploring
Another operating environment?
Choose the sector that matches the job your customers need to do.
The next stage / Contract Engineering
Continue this industry path with Florida Biotech.
Florida Biotech develops or refines the formulation around your surfaces, equipment and procedures. Plant-42 can then review the formula, water specifications, packaging and supply needs for manufacturing.
Project scope, technical information, responsibilities and commercial terms are agreed for the next stage.